2 edition of Metallurgical evaluation of an 18-inch feedwater line failure at the Surry Unit 2 power station found in the catalog.
Metallurgical evaluation of an 18-inch feedwater line failure at the Surry Unit 2 power station
C. Czajkowski
Published
1987 by Region II, U.S. Nuclear Regulatory Commission, Division of PWR Licensing-A, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission in Atlanta, GA, Washington, DC .
Written in
Edition Notes
Statement | prepared by C.J. Czajkowski. |
Contributions | Brookhaven National Laboratory., U.S. Nuclear Regulatory Commission. Region II., U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. Division of PWR Licensing-A. |
The Physical Object | |
---|---|
Pagination | ix, 32 p. : |
Number of Pages | 32 |
ID Numbers | |
Open Library | OL15272362M |
Foods
Saving faith
Cokerheaton.
critical survey of Hindi literature.
To school through the fields
Emergency unemployment compensation
Women of God whom the men left out of the Bible
Letter of John I. Davenport, Esq., on the subject of the population of the city of New York, its density, and the evils resulting therefrom
Connecticuts western colony, the Susquehannah affair
When there is no peace
Wyoming statewide wilderness study report
Information systems management
Response to government consultation on education
Agricultural BMPs applicable to Virginia
Dead Mens Bones
Get this from a library. Metallurgical evaluation of an inch feedwater line failure at the Surry Unit 2 power station.
[C Czajkowski; Brookhaven National Laboratory.; U.S. Nuclear Regulatory Commission. Region II.; U.S. Nuclear Regulatory Commission.
Office of. A metallurgical failure analysis was performed on pieces from a catastrophically failed inch diameter feedwater from the Surry Unit 2 Nuclear Power Station.
The analysis consisted of optical microscopy, chemical analysis, mechanical and Charpy impact testing and evaluation of the material by scanning electron microscopy. Evaluation of flow accelerated corrosion by coupled analysis of corrosion and flow dynamics. Relationship of oxide film thickness, hematite/magnetite ratio, ECP and wall thinning rate.
CO_2 sequestration in ocean, i.e. transportation of liquefied CO_2 removed from flue gas at fossil-fuel-fired power plants through a pipe into the ocean, is considered to be an effective. Based on the operating experience of Surry Unit 2, Maanshan Unit 2 reduced the power to 97% of nominal power in late Novemberand further reduced it to 95% in March Unit 2 started its 15th refueling outage on 12 April, when SG chemical cleaning was carried out.
After this chemical cleaning, the water oscillations by: 5. Full text of "TITLE LIST OF DOCUMENTS MADE PUBLICLY AVAILABLE VOL 2 NO12" See other formats. References [1] Czajkowski, C., “Metallurgical evaluation of an inch feedwater line failure at the Surry Unit 2 power station”, NUREG/CR Brookhaven Nat.
Lab. [2] NISA, “Final report on Mihama-3 secondary system piping failure”, Nuclear and. New England Electric, Brayton Point Unit No. 3: The % BFP Model CHTA-5 with a 31, hp Westinghouse turbine drive was tested after three failures. Rapid increase of the 1/2 x RPM component did not permit the unit to go on-line.5/5(1).
After that, pipe rupture accidents occurred in the secondary cooling systems in both the US and Japan, for instance a secondary pipe rupture of an inch diameter elbow occurred in the feedwater pipe leading to the main feed pump “A” of the Virginia Power Surry Unit #2 in the US in Cited by: Find the root causes.
Apply the correct modification to eliminate these very damaging, built-in design discrepancies. New England Electric, Brayton Point Unit No. 3: The % BFP Model CHTA-5 with a 31, hp Westinghouse turbine drive was tested after three failures. Rapid increase of the 1/2 x RPM component did not permit the unit to go on.